PDF Res# Date Subject Description
- 65 KB 1999-45 1999-10-04 Highways Authorize CM to execute agmt w/TxDOT for install/reimburse of maint & operation of traffic signals on state hwys.
- 45 KB 2000-08 2000-02-21 Highways Agmt w/TxDOT for temporary closure of portions of Main St & Davis St for Rodeo Parade on Apr 1, 2000.
- 4 MB 2000-30 2000-07-17 Highways Auth CM to execute agmt w/TxDOT for temporary closure of SH352/Military Pkwy on 9-16-00 for 1st State Bank of Mesq. Reopening.
- 203 KB 2000-42 2000-10-02 Highways Authorize CM to execute agmt w/TxDOT to close portion of Main St for Pumpkinfest on Oct 26, 2000.
- 46 KB 2001-04 2001-03-05 Highways Authorize City Mgr to execute agmt w/TxDOT for temp closure of Main & Davis for rodeo parade on 3-31-01.
- 47 KB 2001-22 2001-06-05 Highways Authorize CM to execute agmt w/TxDOT for temporary closure of SH352 for Shrine Assn parade.
- 5 MB 2001-54 2001-10-15 Highways Authorize CM to execute agmt with TxDOT for temporary closure of Main Street for Pumpkinfest.
- 50 KB 2002-05 2002-02-18 Highways Authorize City Mgr to execute agmt w/TxDOT for temporary closure of SH352 for various annual and special events.
- 124 KB 2002-06 2002-02-18 Highways Supporting direct access to IH-635 between Town East Blvd and IH-30.
- 733 KB 2002-10 2002-03-04 Highways Authorize Mayor to execute Advanced Funding Agmt W/TxDOT for IH-635 imps no. of TE Blvd & Hwy. 80.
- 83 KB 2002-22 2002-05-07 Highways Support the expeditious design, eng & const.of the East Section of the LBJ Freeway Project as determined thru design charette at ph.
- 956 KB 2002-27 2002-06-03 Highways Authorize Mayor to execute Master Advanced Funding Agreement w/TxDOT.
- 42 KB 2002-47 2002-09-03 Highways Authorize City Mgr to execute a Local Project Advance Funding Agreement with TxDOT for SH190 between IH30 & IH20.
- 740 KB 2002-64 2002-12-16 Highways Auth Mayor to exec Supplemental Agreement to Master Agmt Governing Transportation Major CIP w/TxDOT re Military Parkway.
- 85 KB 2003-01 2003-01-06 Highways Support reconstruction & improvements to Town East Blvd overpass at U.S. Hwy 80 interchange.
- 482 KB 2003-41 2003-08-04 Highways Local Project Advance Funding Agreement w/TxDOT - Downtown Signal System.
- 399 KB 2003-25 2003-06-16 Highways Authorize City Manager to execute Local Trans. Proj. Advance Funding Agrmt w/TxDOT for IH20 interchange at Loop 9.
- 210 KB 2003-26 2003-06-16 Highways Authorize City Manager to execute Local Trans. Proj. Advance Funding Agrmt w/TxDOT for ped. Pathway on Sierra Dr.
- 117 KB 2003-28 2003-06-16 Highways Request of Waiver of Local Match Funds w/TxDOT regarding replacement of Faithon P. Lucas, Sr., Blvd. Bridge.
- 97 KB 2003-52 2003-09-02 Highways Local Project Adv. Funding Agreement w/TxDOT for replacement of Faithon P. Lucas, Sr., Blvd. Bridge.
Total : 3085 Page