PDF Res# Date Subject Description
- 187 MB1997-031997-02-03HighwaysSupporting traffic safety imps along US Hwy. 80 in Mesquite.
- 300 MB1997-251997-07-21HighwaysSupporting the STEP 21 Fed Transportation funding proposal.
- 201 MB1998-131998-04-06HighwaysEncouraging House-Senate committee to adopt a minimum 90% return to states for transportation funding.
- 54 MB1999-211999-06-07HighwaysCity Mgr to sign interlocal agmt w/TxDOT for reimbursement of traffic signal equip Hwy 80 @ Belt Line Rd.
- 52 MB1999-221999-06-07HighwaysCity Mgr to sign interlocal agmt w/TxDOT for reimbursement of traffic signal equip @ IH-30 & Galloway.
- 237 MB1999-261999-07-06HighwaysAuthorize Mayor to sign agmt w/TxDOT re landscape maint at IH-30/Big Town & Hwy 80/Big Town Blvd.
- 48 MB1999-441999-10-04HighwaysAuthorize CM to execute agmt w/TxDOT for temporary closure of Main Street for Pumpkinfest activities.
- 65 MB1999-451999-10-04HighwaysAuthorize CM to execute agmt w/TxDOT for install/reimburse of maint & operation of traffic signals on state hwys.
- 45 MB2000-082000-02-21HighwaysAgmt w/TxDOT for temporary closure of portions of Main St & Davis St for Rodeo Parade on Apr 1, 2000.
- 4 GB2000-302000-07-17HighwaysAuth CM to execute agmt w/TxDOT for temporary closure of SH352/Military Pkwy on 9-16-00 for 1st State Bank of Mesq. Reopening.
- 203 MB2000-422000-10-02HighwaysAuthorize CM to execute agmt w/TxDOT to close portion of Main St for Pumpkinfest on Oct 26, 2000.
- 46 MB2001-042001-03-05HighwaysAuthorize City Mgr to execute agmt w/TxDOT for temp closure of Main & Davis for rodeo parade on 3-31-01.
- 47 MB2001-222001-06-05HighwaysAuthorize CM to execute agmt w/TxDOT for temporary closure of SH352 for Shrine Assn parade.
- 5 GB2001-542001-10-15HighwaysAuthorize CM to execute agmt with TxDOT for temporary closure of Main Street for Pumpkinfest.
- 50 MB2002-052002-02-18HighwaysAuthorize City Mgr to execute agmt w/TxDOT for temporary closure of SH352 for various annual and special events.
- 124 MB2002-062002-02-18HighwaysSupporting direct access to IH-635 between Town East Blvd and IH-30.
- 733 MB2002-102002-03-04HighwaysAuthorize Mayor to execute Advanced Funding Agmt W/TxDOT for IH-635 imps no. of TE Blvd & Hwy. 80.
- 83 MB2002-222002-05-07HighwaysSupport the expeditious design, eng & const.of the East Section of the LBJ Freeway Project as determined thru design charette at ph.
- 956 MB2002-272002-06-03HighwaysAuthorize Mayor to execute Master Advanced Funding Agreement w/TxDOT.
- 42 MB2002-472002-09-03HighwaysAuthorize City Mgr to execute a Local Project Advance Funding Agreement with TxDOT for SH190 between IH30 & IH20.
Total : 3135 Page