PDF Res# Date Subject Description
- 47 MB2001-222001-06-05HighwaysAuthorize CM to execute agmt w/TxDOT for temporary closure of SH352 for Shrine Assn parade.
- 5 GB2001-542001-10-15HighwaysAuthorize CM to execute agmt with TxDOT for temporary closure of Main Street for Pumpkinfest.
- 50 MB2002-052002-02-18HighwaysAuthorize City Mgr to execute agmt w/TxDOT for temporary closure of SH352 for various annual and special events.
- 124 MB2002-062002-02-18HighwaysSupporting direct access to IH-635 between Town East Blvd and IH-30.
- 733 MB2002-102002-03-04HighwaysAuthorize Mayor to execute Advanced Funding Agmt W/TxDOT for IH-635 imps no. of TE Blvd & Hwy. 80.
- 83 MB2002-222002-05-07HighwaysSupport the expeditious design, eng & const.of the East Section of the LBJ Freeway Project as determined thru design charette at ph.
- 956 MB2002-272002-06-03HighwaysAuthorize Mayor to execute Master Advanced Funding Agreement w/TxDOT.
- 42 MB2002-472002-09-03HighwaysAuthorize City Mgr to execute a Local Project Advance Funding Agreement with TxDOT for SH190 between IH30 & IH20.
- 740 MB2002-642002-12-16HighwaysAuth Mayor to exec Supplemental Agreement to Master Agmt Governing Transportation Major CIP w/TxDOT re Military Parkway.
- 85 MB2003-012003-01-06HighwaysSupport reconstruction & improvements to Town East Blvd overpass at U.S. Hwy 80 interchange.
- 482 MB2003-412003-08-04HighwaysLocal Project Advance Funding Agreement w/TxDOT - Downtown Signal System.
- 399 MB2003-252003-06-16HighwaysAuthorize City Manager to execute Local Trans. Proj. Advance Funding Agrmt w/TxDOT for IH20 interchange at Loop 9.
- 210 MB2003-262003-06-16HighwaysAuthorize City Manager to execute Local Trans. Proj. Advance Funding Agrmt w/TxDOT for ped. Pathway on Sierra Dr.
- 117 MB2003-282003-06-16HighwaysRequest of Waiver of Local Match Funds w/TxDOT regarding replacement of Faithon P. Lucas, Sr., Blvd. Bridge.
- 97 MB2003-522003-09-02HighwaysLocal Project Adv. Funding Agreement w/TxDOT for replacement of Faithon P. Lucas, Sr., Blvd. Bridge.
- 272 MB2003-672003-12-01HighwaysAuthorizing CM to execute Local Project Advanced Funding Agrmt w/TxDOT for Intelligent Transportation System Project.
- 476 MB2004-072004-02-16HighwaysAuthorize CM to execute LPAFA for traffic signal impr. at Town East Blvd. & N. Galloway and along Towne Centre Dr.
- 175 MB2004-082004-03-01HighwaysAuthorize Mayor to execute an amendment to Master Adv. Funding Agrmt w/TxDOT - Mesq. Sect. Of LBJ Corridor.
- 341 MB2004-222004-06-07HighwaysAuthorizing Mayor to execute Amendment #2 to Adv. Funding Agrmt w/TxDOT for Mesq. Sect. Of LBJ Corridor Proj Ph 1.
- 1 GB2004-472004-11-01HighwaysAuthorize CM to execute LPAFA w/TxDOT to design & construct new connection between US 80 & Forney Rd.
Total : 3127 Page