City Construction Project Status Report ( December 11, 2024 )
Large Diameter Water Valve and RCCP Replacement |
---|
City Project Manager : Steven Anderson, P.E. (sanderson@cityofmesquite.com) | City Inspector : Danny Barrett (dlbarret@cityofmesquite.com) |
Project Description : This project will provide for water and sewer adjustments at the following locations throughout the City:
1. 2500-2600 Block of Northview Drive: Remove 2-inch threaded outlets on 24-inch RCCP on Northview between Motley and Baker
2. 1425 Gross Road (Gross Road West of IH 635 and Peachtree Road): Install 24-inch valve on east side of IH 635 at Gross Road
3. 1325 Gross Road @ IH 635 (west side): Add 24-inch gate valve to 24-inch water main
4. 1135 Gross Road (Gross Road East of IH 635): Adjust 24-inch RCCP water main and replace sanitary sewer below |
Status : Design 100% Complete | Projected Completion Date : unknown |
---|
What's happening now: |
---|
Consultant is evaluating design to see if changes can be made to bring bid prices down to budgeted levels. | Work Anticipated next 30-days: |
---|
Design evaluation. |
|
|