PDF Res# Date Subject Description
- 107 MB1972-251972-08-21HighwaysState Highway Dept. install lighting on Highway 80 and I30
- 164 MB1972-431972-12-04HighwaysSupport State Highway Commission on signalization projects
- 64 MB1974-021974-01-07HighwaysSignal Project at intersection of I635 westbound State Highway 352
- 88 MB1974-241974-08-05HighwaysState signal project at Interstate Highway 635 at Gross & Ridgeview St.
- 310 MB1975-301975-10-06HighwaysAccess ramps on U. S. Highway 80 at Gus Thomasson Road
- 154 MB1976-011976-01-05HighwaysUrging Dallas County Commissions for construction of Loop 9 project
- 88 MB1977-301977-11-21HighwaysState of Texas contract for Gus Thomasson access ramp
- 261 MB1979-151979-05-07HighwaysState of Texas agreement for Highway Illumination Project I30, U.S.80 and I635
- 251 MB1979-321979-07-16HighwaysEminent domain to acquire ROW for Gus Thomasson-Highway 80 exit ramp
- 95 MB1984-011984-01-09HighwaysExit ramp I635 to La Prada
- 77 MB1984-111984-04-16HighwaysSupport of Increased Highway Funding
- 197 MB1984-131984-05-21HighwaysRelocation of access ramp of I635 north of Town east Blvd.
- 93 MB1984-191984-07-16HighwaysAuthorize agreement with Dept. of Highway & Public Transportation - Lighting on I30
- 87 MB1984-251984-10-22HighwaysAgreement with Dept. of Highways re relocation of utility lines
- 90 MB1986-091986-03-03HighwaysModification for Eastbound off ramp from I30
- 180 MB1986-391986-12-01HighwaysConstruct exit ramps from I635 to New Market, Scyene & Military
- 353 MB1987-061987-02-02HighwaysInterstate Highway ROW southwest of N. Galloway and I635
- 81 MB1988-121988-04-04HighwaysConsider proposed improvement of traffic access from U.S. Hwy. 80 to Southeast Mesquite
- 83 MB1989-161989-06-19HighwaysDevelop a design alternative which includes direct freeway ramp access to Oates Dr.
- 174 MB1989-441989-12-18HighwaysDesignate locally preferred route for SH 190 & authorize the route alignment study.
Total : 3130 Page