PDF Res# Date Subject Description
- 392 MB2004-502004-11-15HighwaysSupporting the Local Preferred Investment Strategy recommended by the East Corridor Major Investment Study.
- 919 MB2004-512004-12-06HighwaysAmendment No. 3 to Advance Funding Agreement w/TxDOT for LBJ Corridor Project.
- 1 GB2005-072005-02-07HighwaysAuthorizing the Mayor to execute an Advance Funding Agreement w/TxDOT - LBJ Corridor Project, Phase Two.
- 2 GB2005-302005-08-01HighwaysAuthorize Mayor to execute a Suppl. Agrmt to Advance Funding Agreement w/TxDOT for LBJ Corridor Proj., Ph 2 & 2B.
- 1 GB2005-362005-09-06HighwaysAuthorizing the City Manager to execute LPAFA w/TxDOT in conjunction w/LBJ Project, Mesquite Section, Phase 2.
- 972 MB2005-482005-11-07HighwaysAuthorizing City Manager to execute & approve a LPAFA w/TxDOT for right-turn lane at N. Galloway & U.S. Hwy. 80.
- 160 MB2006-432006-07-17HighwaysAuthorize CM to execute & approve LAPAFA with TxDOT for traffic signal improvements for $67,600.00.
- 42 MB2006-552006-08-21HighwaysAuthorize CM to execute LPAFA w/TxDOT for installation of traffic signal at N. Galloway & Highland Village for $213,400.
- 381 MB2006-592006-09-05HighwaysAuthorize Mayor to execute Amendment #4 to Adv. Fund Agrmt w/TxDOT for $300,000-Mesq Sect of LBJ Corridor, Ph 2 & 2B.
- 62 MB2006-612006-09-18HighwaysDecline support to relocate IH 20 Interchange @ Falcon's Lair & deviation or amend design for IH 20 & Falcon's Lair interchange.
- 36 MB2007-222007-05-21HighwaysAuthorize CM to execute Local Project Maintenance Agreement w/TxDOT for construction of pedestrian pathway on Baker Dr.
- 61 MB2007-252007-06-18HighwaysAuthorize CM to exexute LPAFA w/TxDOT for turn lane @ Gus Thomasson/TE Blvd. & traffic signal @ Gus Thomasson/N. Mesq.
- 197 MB2007-282007-07-16HighwaysRatify execution of TxDOT Standard Utility Agreement by CM for relocation of franchise & City-owned facilities - LBJ Ph 2 Proj.
- 45 MB2007-472007-10-02HighwaysAuthorize CM to execute a LPAFA w/TxDOT for design & reconstruction of US Hwy 80 & Town East Blvd. interchange.
- 47 MB2009-162009-04-20HighwaysAuthorizing the Mayor to approve and execute a Municipal Maintenance Agreement with TxDOT.
- 41 MB2009-142009-04-20HighwaysAuthorizing the City Manager to execute an agreement with TxDOT for the temporary closure of State right-of-way on April 24 -26, 2009, for the 3rd annual Real. Texas. Festival.
- 285 MB2009-202009-06-15HighwaysAuthorizing the Mayor to execute the Standard Utility Agreement Supplemental Agreement No. 2 with the Texas Department of Transportation (TxDOT) for additional survey services in conjunction with the LBJ (Mesquite Section) Phases 2 and 2B Project in an amount of $44,580.00.
- 48 MB2009-212009-07-06HighwaysAuthorizing the City Manager to execute a Local Project Advance Funding Agreement for traffic signals with the Texas Department of Transportation to provide materials for the North Galloway Avenue at Highland Village Drive project.
- 60 MB2010-102010-03-15HighwaysAuthorizing the City Manager to execute an agreement with the Texas Department of Transportation (TxDOT) for the temporary closure of State right-of-way along a portion of Main Street and Davis Street between North Florence Street and Carmack Street in conjunction with the Exchange Club of Mesquite Rodeo Parade activities on Saturday, March 27, 2010.
- 62 MB2010-112010-04-05HighwaysAuthorizing the City Manager to execute an agreement with the Texas Department of Transportation (TxDOT) for the temporary closure of State right-of-way at Scyene Road between Peachtree Road and Rodeo Drive from April 23, 2010, through April 24, 2010, for the fourth annual Real. Texas. Festival. commemorating the 53rd anniversary of the Mesquite Championship Rodeo.
Total : 3127 Page