| PDF |
Res# |
Date |
Subject |
Description |
- 45 MB | 2000-08 | 2000-02-21 | Highways | Agmt w/TxDOT for temporary closure of portions of Main St & Davis St for Rodeo Parade on Apr 1, 2000. |
- 4 GB | 2000-30 | 2000-07-17 | Highways | Auth CM to execute agmt w/TxDOT for temporary closure of SH352/Military Pkwy on 9-16-00 for 1st State Bank of Mesq. Reopening. |
- 203 MB | 2000-42 | 2000-10-02 | Highways | Authorize CM to execute agmt w/TxDOT to close portion of Main St for Pumpkinfest on Oct 26, 2000. |
- 46 MB | 2001-04 | 2001-03-05 | Highways | Authorize City Mgr to execute agmt w/TxDOT for temp closure of Main & Davis for rodeo parade on 3-31-01. |
- 47 MB | 2001-22 | 2001-06-05 | Highways | Authorize CM to execute agmt w/TxDOT for temporary closure of SH352 for Shrine Assn parade. |
- 5 GB | 2001-54 | 2001-10-15 | Highways | Authorize CM to execute agmt with TxDOT for temporary closure of Main Street for Pumpkinfest. |
- 50 MB | 2002-05 | 2002-02-18 | Highways | Authorize City Mgr to execute agmt w/TxDOT for temporary closure of SH352 for various annual and special events. |
- 124 MB | 2002-06 | 2002-02-18 | Highways | Supporting direct access to IH-635 between Town East Blvd and IH-30. |
- 733 MB | 2002-10 | 2002-03-04 | Highways | Authorize Mayor to execute Advanced Funding Agmt W/TxDOT for IH-635 imps no. of TE Blvd & Hwy. 80. |
- 83 MB | 2002-22 | 2002-05-07 | Highways | Support the expeditious design, eng & const.of the East Section of the LBJ Freeway Project as determined thru design charette at ph. |
- 956 MB | 2002-27 | 2002-06-03 | Highways | Authorize Mayor to execute Master Advanced Funding Agreement w/TxDOT. |
- 42 MB | 2002-47 | 2002-09-03 | Highways | Authorize City Mgr to execute a Local Project Advance Funding Agreement with TxDOT for SH190 between IH30 & IH20. |
- 740 MB | 2002-64 | 2002-12-16 | Highways | Auth Mayor to exec Supplemental Agreement to Master Agmt Governing Transportation Major CIP w/TxDOT re Military Parkway. |
- 85 MB | 2003-01 | 2003-01-06 | Highways | Support reconstruction & improvements to Town East Blvd overpass at U.S. Hwy 80 interchange. |
- 482 MB | 2003-41 | 2003-08-04 | Highways | Local Project Advance Funding Agreement w/TxDOT - Downtown Signal System. |
- 399 MB | 2003-25 | 2003-06-16 | Highways | Authorize City Manager to execute Local Trans. Proj. Advance Funding Agrmt w/TxDOT for IH20 interchange at Loop 9. |
- 210 MB | 2003-26 | 2003-06-16 | Highways | Authorize City Manager to execute Local Trans. Proj. Advance Funding Agrmt w/TxDOT for ped. Pathway on Sierra Dr. |
- 117 MB | 2003-28 | 2003-06-16 | Highways | Request of Waiver of Local Match Funds w/TxDOT regarding replacement of Faithon P. Lucas, Sr., Blvd. Bridge. |
- 97 MB | 2003-52 | 2003-09-02 | Highways | Local Project Adv. Funding Agreement w/TxDOT for replacement of Faithon P. Lucas, Sr., Blvd. Bridge. |
- 272 MB | 2003-67 | 2003-12-01 | Highways | Authorizing CM to execute Local Project Advanced Funding Agrmt w/TxDOT for Intelligent Transportation System Project. |